The Corps of Engineers at Milford Lake has increased the outflow from the reservoir from 3,000 cubic feet per second to 4,000 cubic feet per second.
The Corps reported on Tuesday that the current lake elevation is 1,147.82, which is 3.42 feet above conservation pool.
The inflow at the Clay Center gauge is 965 cfs.
A higher release is planned for Wednesday.